QLD Layout - 0607 - Oxhill and Fairley Road

QLD - 0607 - BRMA British Layouts "Oxhill & Fairley Road" GWR, SR, LMS & BR(W) & BR(M) 1930's & post 1948 DC 4mm/OO 1:76

QLD - 0607 - The Oxhill and Fairley Road - More Information

QLD - 0607 - The Oxhill and Fairley Road - More Information

    
PICT0004 A  Fairley Road Signal Box
1 Fairley Road Signal Box
PICT0016 A  Fairley Road Station
2 Fairley Road Station
Fairley Road - Jan 03[1]e  Fairley Road in 2003 with a GWR 'B' Set in the bay platform.
3 Fairley Road in 2003 with a GWR 'B' Set in the bay platform.
Fairley Road engine shed 109[1]  Fairley Road engine shed.
4 Fairley Road engine shed.
Oxhill Feb 99[1]e  Oxhill station stage 1, 1999, with Collett 0-6-0 ready to depart and branch line Auto trainwaiting for a connection.
5 Oxhill station stage 1, 1999, with Collett 0-6-0 ready to depart and branch line Auto trainwaiting for a connection.
Oxhill towards west Feb 99[1]e
6
Oxhill Sept 05[1]e  Oxhill with extra platform and extension. An 8F and a Jinty amble through platform 1.
7 Oxhill with extra platform and extension. An 8F and a Jinty amble through platform 1.
PICT00173 A  Oxhill Signal Box
8 Oxhill Signal Box
PICT0067 B  A busy moment at the Oxhill loco shed.
9 A busy moment at the Oxhill loco shed.
Picture4  Oxhill goods yard with the station footbridge behind.
10 Oxhill goods yard with the station footbridge behind.
Oxhill with Up pass train 0109[1]
11
O and FR 25 9 10  Update Dec.2010 - The opportunity was taken to add a small township over part of the Ashford-Stratford Fiddle yard.
12 Update Dec.2010 - The opportunity was taken to add a small township over part of the Ashford-Stratford Fiddle yard.
O and FR  20-11- 03  Update Dec.2010 - Extra detail such as these farm sheds has been added.  The tunnel leading to Reading layover is in the background.
13 Update Dec.2010 - Extra detail such as these farm sheds has been added. The tunnel leading to Reading layover is in the background.
O and FR 9 10 012  Update Dec.2010 - The rearrangements enabled a better transition to be laid into Fairley Road and extension of the loco shed siding.
14 Update Dec.2010 - The rearrangements enabled a better transition to be laid into Fairley Road and extension of the loco shed siding.
O and FR 25 9 10 001  Update Dec.2010 - A goods heads down the branch towards Fairley Road on the section added to the layout.
15 Update Dec.2010 - A goods heads down the branch towards Fairley Road on the section added to the layout.